American Structurepoint Plan Room
Public Projects
Private Projects
Addendum Watch
Sign In/Register
City of Carmel Utilities - Digester Gas Piping Replacement Project - #2018.02061
Information
Plan Holders
Plans
Shipping Information
Addenda
Filter:
COVER
TITLE SHEET
0010_COVER.TIF
G101
INDEXS AND GENERAL INFORMATION
0020_G101.TIF
G102
SCHEDULES AND ABBREVIATIONS
0030_G102.TIF
G200
EXISTING GAS PIPING SCHEMATIC AND DEMOLITION PLAN
0040_G200.TIF
G201
PROPOSED GAS PIPING SCHEMATIC
0050_G201.TIF
G202
WATER LINE SCHEMATICS
0060_G202.TIF
C100
BENCHMARK AND CONTROL PLAN
0070_C100.TIF
PD100
DIGESTERS 1 AND 2 COVER AND PIPING DEMOLITION PLAN
0080_PD100.TIF
PD101
DIGESTERS 1 AND 2 REHABILITATION PHOTOS
0090_PD101.TIF
PD102
DIGESTERS 1 AND 2 COVER AND PIPING DEMOLITION SECTION
0100_PD102.TIF
PD103
DIGESTERS 1 AND 2 COVER AND PIPING DEMOLITION SECTION
0110_PD103.TIF
PD104
DIGESTERS 3 AND 4 GAS PIPING DEMOLITION PLAN AND SECTIONS
0120_PD104.TIF
P100
DIGESTERS 1 AND 2 COVER AND PIPING REHABILITATION
0130_P100.TIF
P101
DIGESTERS 1 AND 2 REHABILITATION PHOTOS
0140_P101.TIF
P102
DIGESTERS 1 AND 2 COVER AND PIPING REHABILITATION
0150_P102.TIF
P103
DIGESTERS 1 AND 2 PIPING REHABILITATIION DETAILS
0160_P103.TIF
P104
DIGESTERS 3 AND 4 GAS PIPING REPLACEMENT
0170_P104.TIF
P105
DIGESTER WALL REPAIRS - PLAN VIEW
0180_P105.TIF
P106
DIGESTER WALL REPAIRS - DIGESTER 1 AND 2
0190_P106.TIF
P107
DIGESTER WALL REPAIRS - DIGESTER 3 AND 4
0200_P107.TIF
PD200
EXISTING DIGESTER GAS PIPING DEMOLITION (FIRST FLOOR)
0210_PD200.TIF
PD201
EXISTING DIGESTER GAS PIPING DEMOLITION (LOWER LEVEL)
0220_PD201.TIF
PD202
EXISTING DIGESTER GAS PIPING DEMOLITION SECTIONS
0230_PD202.TIF
PD203
EXISTING DIGESTER GAS PIPING DEMOLITION SECTIONS
0240_PD203.TIF
PD204
DIGESTER CONTROL BUILDING DEMOLITION PHOTOS
0250_PD204.TIF
PD205
DIGESTER CONTROL BUILDING DEMOLITION PHOTOS
0260_PD205.TIF
P200
PROPOSED DIGESTER GAS PIPING (FIRST FLOOR)
0270_P200.TIF
P201
PROPOSED DIGESTER GAS PIPING (LOWER LEVEL)
0280_P201.TIF
P202
PROPOSED DIGESTER GAS PIPING SECTIONS
0290_P202.TIF
P400
GAS EQUIPMENT DETAILS
0300_P400.TIF
P401
DETAILS
0310_P401.TIF
S100
GENERAL NOTES AND DETAILS
0320_S100.TIF
E100A
ELECTRICAL SITE OVERVIEW
0330_E100A.TIF
E100B
ELECTRICAL SITE OVERVIEW - DETAILS
0340_E100B.TIF
E101A
DIGESTER BUILDING ONE-LINE
0350_E101A.TIF
E101B
DIGESTER BUILDING ONE-LINE
0360_E101B.TIF
E101C
DIGESTER BUILDING ONE-LINE
0370_E101C.TIF
E101D
MAIN PLANT SWITCHGEAR BUILDING
0380_E101D.TIF
E102
ELECTRICAL GAS DETECTION P&ID
0390_E102.TIF
E103
ELECTRICAL DEMOLITION
0400_E103.TIF
E104
ELECTRICAL INSTRUMENTATION - NEW WORK
0410_E104.TIF
E105A
ELECTRICAL GAS AND FIRE SYSTEM AND CONTROLS
0420_E105A.TIF
E105B
ELECTRICAL GAS AND FIRE SYSTEM AND CONTROLS
0430_E105B.TIF
E106A
EMERGENCY VALVE CONTROL PANEL
0440_E106A.TIF
E106B
EMERGENCY VALVE CONTROL PANEL WIRING DIAGRAM
0450_E106B.TIF
E107
INSTRUMENTATION DETAILS
0460_E107.TIF
E200
LIGHTING PLAN (LOWER LEVEL) - DEMO WORK PLAN
0470_E200.TIF
E201
LIGHTING PLAN (LOWER LEVEL) - NEW WORK PLAN
0480_E201.TIF
MD100
MECHANICAL DEMOLITION PLAN
0490_MD100.TIF
M100
MECHANICAL NEW EQUIPMENT LAYOUT
0500_M100.TIF
M101
HOT WATER FOR HYDRONIC HEATER
0510_M101.TIF
M200
MECHANICAL SCHEDULES
0520_M200.TIF
If you need assistance with this plan room please contact
Eastern Engineering Here
.
© Copyright Eastern Engineering 2001-2024